Rough-In Electrical Inspection: What the Inspector Checks Before the Drywall

Rough-in electrical inspection explained: what the inspector checks while the walls are open, the mistakes that fail most often, and how to prepare.

A rough-in electrical inspection is the only moment anyone gets to see the wiring of your remodel or new home before it disappears behind drywall for the next fifty years. After that, everything rests on trust. This guide explains when the rough-in electrical inspection happens, what the inspector checks while the walls are open, the mistakes that fail most often, and how to prepare so you pass the first time.

Rough-in electrical inspection: when it happens

The rough-in comes after the boxes are mounted and the cables are pulled, and before insulation and drywall go up. In many jurisdictions it is scheduled together with, or just before, the plumbing and mechanical rough-ins and the framing inspection. The final inspection follows later, once the devices, fixtures and cover plates are installed.

The exact order and the number of visits differ from one city or county to the next, so ask when you get the permit. Some jurisdictions add a separate visit for the service or for the grounding electrode before concrete is poured. Which work needs a permit at all is explained in electrical permit: when do you need one?

What the inspector checks at rough-in

The boxes

Every box has to be securely fastened and set at the right depth for the wall finish that is coming, so it will end up flush with the drywall. The inspector also looks at box fill: each conductor, clamp and device counts against the volume of the box. An overfilled box is easy to fix now and annoying to fix later.

The inspector also looks ahead. A junction box has to stay accessible once the house is finished, so it cannot end up behind drywall, tile or a fixed cabinet. Planning where the cabinets and tiles will go before the boxes are set saves a lot of trouble later.

The panel location

If a new panel or subpanel is part of the job, its location is checked now, while it can still be moved. It needs clear working space in front of it, and it cannot go in a clothes closet or a bathroom. A panel that ends up behind a door, above a stairway or inside a built in cupboard is one of the most common findings in older remodels, usually because the room was built around the panel afterwards.

The cables

Nonmetallic cable has to be fastened within twelve inches of a box and roughly every four and a half feet along the run. Where a hole is bored less than one and a quarter inches from the face of a stud or joist, the cable needs a steel nail plate, so the next person hanging a picture does not find the wire with a nail. The inspector also checks that cables are not damaged, kinked or stapled flat through the sheath.

The circuits

The inspector compares what is installed with what the code and your plans require: the dedicated circuits for the kitchen countertops, the bathroom and the laundry, and the right wire size for each circuit. The basic pairing is 14 AWG copper on a 15 amp breaker and 12 AWG on a 20 amp breaker. Locations that will need GFCI or AFCI protection at the final are noted now, because the way the circuits are run affects how that protection can be provided. See where the NEC wants GFCI protection.

Grounding and bonding

The equipment grounding conductors in each box are usually expected to be spliced together already at rough-in, and connected to metal boxes. Many inspectors also want the conductor ends left long enough in the box to make the connections at the final. This is the one moment the grounding of the whole job can be seen at a glance.

The mistakes that fail a rough-in most often

  1. Insulation already installed, so the inspector cannot see the cables.
  2. Missing nail plates where cables run close to the edge of the framing.
  3. Cables not stapled near the box, or left hanging across open framing.
  4. Overfilled boxes, often at a switch location where several cables meet.
  5. Grounds not spliced or not connected to a metal box.
  6. A required circuit missing, such as a dedicated bathroom or laundry circuit.
  7. Boxes placed where they will end up hidden, behind a planned cabinet or in a wall that will be tiled.
  8. Work that does not match the permit, for example an extra subpanel or a circuit for a hot tub that was never on the application.

Many of the defects that later turn up in a home inspection started as a rough-in mistake nobody caught. Our list of the 22 findings in every electrical inspection report shows where they end up.

Rough-in electrical inspection: how to prepare

  1. Post the permit card where the inspector can find it, and keep the approved plans on site.
  2. Make sure every box is in, including the ones for smoke alarms, exhaust fans and outdoor outlets.
  3. Keep the walls and ceilings open, with no insulation in the way.
  4. Label the home runs at the panel, so the inspector can see which cable feeds which room.
  5. Walk the job with your electrician the day before, with the list of common mistakes in hand.
  6. Photograph every wall before the drywall goes up. Those photos are worth gold the next time you want to hang a cabinet or add an outlet.

Adding new circuits in the remodel? Check first whether your panel can carry them with the circuit load calculator.

Never cover work before it passes

This is the expensive mistake. If insulation or drywall goes up before the rough-in passes, the inspector can require it to come down again, at your cost. Wait for the written pass, even if the drywall crew is already scheduled.

In fifteen years of inspecting electrical installations, I saw that the rough-in is where an inspector sees the most with the least effort. Every cable, every staple and every splice is in plain view. Once the walls are closed, nobody can check them anymore without breaking something.

After the rough-in: the final inspection

At the final, the inspector checks what the rough-in could not show yet: the devices and fixtures, GFCI and AFCI protection, tamper resistant receptacles, cover plates, the panel directory and the working space in front of the panel. If something does not pass, our guide to a failed electrical inspection explains what happens next.

Rough-in electrical inspection: the short version

The rough-in electrical inspection happens after boxes and cables are installed and before insulation and drywall. The inspector checks the boxes and whether they will stay accessible, the cable fastening and protection, the circuits, the grounding and the panel location. Prepare by keeping everything open and labeled, walk the job with your electrician the day before, take photos, and never cover anything until the pass is in writing.

This article is general information about residential electrical systems, not a code ruling for your home. Code adoption varies by state and city, and your local electrical inspector has the final word. Have any work done by a licensed electrician.